Marked-up cut plan
Before any wall comes down, you see a floor plan with red for cuts, green for keepers, yellow for sheet-and-protect. Original mouldings, hidoors, encaustic tile, working supply lines flagged green.
Demolition · foreman-led · Barcelona-wide
Apartment gut, kitchen and bathroom strip-out, opening up walls between rooms, full villa demolition. We plan the cuts to protect what stays — original plaster mouldings, encaustic tile, the supply and drain that will be reused. Comunidad notice drafted, saco or container booked, dust controlled with plastic sheeting and a HEPA vacuum.
DEMOLITION · BARCELONA · 2025
Demolition is the cheapest stage to do badly
Most regret in a renovation traces back to demolition week. A tile floor that turned out to be encaustic gets binned. A plaster cornice cracks because nobody sheeted the room. The drain stack that was meant to be reused gets cut six inches too short. We plan the cuts on a marked-up floor plan first — what comes out, what stays, what gets sheeted and protected — then we run the strip-out from that plan.
Before any wall comes down, you see a floor plan with red for cuts, green for keepers, yellow for sheet-and-protect. Original mouldings, hidoors, encaustic tile, working supply lines flagged green.
Most apartment demolition needs the licencia de obras menores (small works) plus comunidad notice. Structural cuts need an arquitecto and a licencia de obras mayores. We file both, post the notice, attend the junta.
Plastic sheeting on every doorway, HEPA vacuum in the corridor, water mist on tile breakouts. Eixample noise hours respected (8:00–13:00, 16:00–20:00). Neighbours notified before the first hammer.
Saco for under 6 m³ (kitchen + one bath strip). Container with municipal permit for full gut. Both with the cooling-off cycle and the parking permit handled — no fines, no surprise pickup delays.
Demolition quote · 5 questions, 1 minute
Five questions and Dani calls you back the same day. Survey is free. Fixed-price quote within 48 hours, with the cut plan and the permit roadmap attached.
Two scopes, same cut plan
Apartment kitchen and bathroom strip-out, non-structural partition walls down, tile and floor lifted, finishes removed. Saco or small container booked with the municipal permit. Dust control with plastic sheeting and HEPA vacuum. Typical for cosmetic and one-bedroom renovations.

How we work · 4 stages
Free site visit. Floor plan marked: red for cut, green for keepers, yellow for sheet-and-protect. Asbestos check on pre-1980 finishes. Fixed-price quote within 48 hours.
Licencia de obras menores filed, mayores if structural. Comunidad notice posted, junta attended if required. Saco or container booked for the cooling-off date.
Plastic sheeting on doorways, HEPA vacuum running, water mist on tile breakouts. Strip-out staged room by room. Mouldings braced. Salvage for items the client keeps.
Debris staged to saco or container. Site swept, vacuumed, walls and slab inspected for hidden surprises. Photos delivered. Site handed to the build phase the same day if scheduled.
Common demolition questions
Free site survey
Send your address, the scope, and the timeline. Dani calls back the same day to book the survey and confirm the price corridor.