Full apartment rewire
Old aluminium and undersized copper pulled out. New circuit map: separate kitchen, bathroom, AC, heat pump, EV, smart-home. RCDs and modern breakers. Cable sized to actual load.
Electrical works · REBT · Eixample · Sarrià · Maresme villas
Reform-scale electrical works for apartments and villas: full rewires, panel upgrades, multi-zone smart-home wiring, EV charging, photovoltaic-ready backbone. Boletín filed at every install. Bigger scope than a single call-out — same Spanish-registry team.
REWIRE · EIXAMPLE · 2025
Reform-scale, not call-out
Full apartment rewires, multi-circuit panel upgrades and smart-home backbones run alongside renovation. Walls open, chases run, every cable sized to spec, every connection tested. REBT certificate signed at handover so the install is legal for sale and insurance.
Old aluminium and undersized copper pulled out. New circuit map: separate kitchen, bathroom, AC, heat pump, EV, smart-home. RCDs and modern breakers. Cable sized to actual load.
KNX or Loxone-ready cable runs to every wall switch position. Even if you skip smart-home now, the wiring is there for upgrade. Adds 5–8% to the rewire cost.
Roof or balcony PV cable run to the panel during rewire. EV charging point on a dedicated circuit. Both legal under the new boletín; no separate filing needed.
Villas with heat pump, pool pump, EV charger and induction kitchen often need three-phase. We coordinate with the distributor (Endesa) for the upgrade and run the new feed.
Electrical works quote · 5 questions
Five questions and Dani schedules the site visit. Fixed-price quote within 5 working days, sized to your scope, with REBT boletín included at install.
Two install scales
New panel with RCDs and modern breakers, separate circuits for kitchen, bathroom, AC, lighting, sockets. REBT-spec cable sized to load. Boletín signed at handover. Right for 60–100 m² apartment rewire during renovation.

How we work · 4 stages
Half a day on site. Measure each room, plan circuit map: kitchen, bathroom, AC zones, smart-home, EV. Cable sizes calculated against real load + 20% spare.
Within 5 working days. Materials, labour, REBT filing fees, three-phase coordination if needed. Line by line. Approve before work proceeds.
Walls chased before any other trade closes them. Cable run to each point with proper labelling. Pulled in protective conduit on key runs. Continuity tested before plaster.
New panel installed, every circuit tested, RCDs verified, smart-home cable terminated. Boletín filed with industry. You get the certificate, labelled panel diagram and warranty pack.
Common questions
Free first consultation
Send your address, the property scope, and what you have in mind (rewire, smart-home, EV, three-phase). Dani schedules the site visit, runs the circuit map, sends a fixed-price quote within 5 working days.