Office interior design · startups · scale-ups · professional firms
Office interior design in Barcelona, work modes drive the plan.
We design offices for teams that have moved past the "everyone at one long desk" stage. The package covers workspace zoning, acoustic strategy, meeting-room mix, daylight and lighting plan, FF&E specification, and where you want it, supervision through move-in. Núria leads from the COAC side. Fixed design-fee proposal seven days after the site visit.
Office fit-outsTech, finance, professional firms since 2022
5–14 wk
Design delivery5–8 wk concept · 9–14 wk full package
7 days
Fixed-fee proposalAfter site visit + work-mode workshop
COAC
Architect on the fileNúria Bosch, Catalan Architects' Association
An office is not a big living room with desks
Work modes first, desk count second.
Modern offices are not about how many people fit. They are about which work modes the day contains: focused solo work, two-person syncs, four-person reviews, all-hands, video calls, lunch, after-work. Each mode wants different acoustics, different light, different proximity. We map the modes against the day, then design rooms that match.
01
Architect-led design (Núria, COAC member)
Núria Bosch leads every office project. Architect by training, ten years on workplace design, COAC member, current with Catalan workplace regulations (RD 486/1997 minimum standards) and licence d'activitats workflow for office use. She runs the work-mode workshop with the leadership team.
02
Acoustic zoning, not "open plan good or bad"
The open-plan vs cellular debate is solved on a per-mode basis. Focus rows, speech-permitted collaboration zones, phone-booth pods, glazed meeting rooms with acoustic seal, plus a quiet retreat for video calls. Background noise targets per zone (NC-30 to NC-40), wall-to-ceiling acoustic strategy, baffles where post-build measurement asks for them.
03
Daylight as the ceiling system
Daylight first, electric light to fill the gaps, not the other way round. Workstations face daylight obliquely (no glare, no back-to-window video calls). Glazed meeting rooms borrow daylight into the core. Output is an IES-style plan a REBT-certified electrician can wire from, with circadian dimming where the brief allows.
04
FF&E that survives the 2-year scale-up
Fast-growing teams change. We specify height-adjustable desks, modular meeting tables, demountable phone booths, stackable seating. The fit-out at 25 people works at 50 with one weekend of reconfig. Premium contract suppliers (Vitra, Herman Miller, USM, plus Spanish brands). Trade pricing passes through.
Design proposal · 7 questions, 2 minutes
Real design fee for your office, after a site visit.
Seven questions and we send a fixed proposal within 7 working days of the site visit. Proposal covers scope, deliverables, work-mode workshop, acoustic study, FF&E specification, optional supervision phase, and a post-occupancy review block.
Three office design tiers
Pick the depth. Work-mode workshop runs on every tier.
Concept · zoning and work-mode plan
The right entry point when leadership needs a clear plan before commissioning a builder, signing a lease or pitching the move to staff. We map work modes against the day, propose a zoning plan, set acoustic strategy, set material direction. Used as the brief for the builder or as the basis for the lease decision.
From
€40/m²
Timeline
5–8 weeks
Work-mode workshop with leadership teamincluded
Headcount + growth model (current and 24 months out)included
Zoning plan with mode allocation per zoneincluded
Acoustic strategy (background noise targets per zone)included
Material direction with sample referencesincluded
Concept presentation (one round of revisions)included
Full design · execution-ready package
Concept plus the working drawings, lighting plan, MEP coordination, FF&E specification and acoustic detailing that a fit-out contractor can quote and execute from. Right when you have a builder lined up and the lease is signed. Includes licence d'activitats coordination for office use.
From
€65/m²
Timeline
9–14 weeks
Everything in Conceptincluded
3D renders of key views (3 angles per zone)included
Working drawings: plans, sections, elevations, detailsincluded
Lighting plan + REBT-ready electrical layoutincluded
Licence d'activitats coordination with Ajuntamentincluded
Premium with supervision · move-in ready
Full design plus the parts that decide whether the team walks in on a Monday and gets work done: weekly site supervision through fit-out, FF&E procurement (sourcing, ordering, delivery, install), custom signage and graphics coordination, post-occupancy evaluation 30 days after move-in. The team you brief is the team that walks the office on launch day.
Acoustic measurement and remediation post-buildincluded
Move-in styling and IT/AV coordinationincluded
30-day post-occupancy evaluationincluded
How we work · 5 stages
Brief, design, document, fit out, move in.
Brief + workshop
Half a day with the leadership team. Work modes mapped against the day, headcount model agreed, growth scenario set. Same-day verbal direction, written proposal within 7 working days.
Concept + sign-off
Zoning plan, acoustic strategy, material direction, key view sketches. One round of revisions. Sign-off in writing before working drawings start.
Working package
Plans, sections, elevations, lighting, MEP, acoustic detailing, finishes schedule, FF&E specification. Detailed enough that two competing fit-out contractors can quote on the same scope.
Fit-out + permit
Licence d'activitats files in parallel with the build. Premium tier: weekly site supervision. Full design: monthly check-ins. IT and AV coordination begins 4 weeks before move-in.
What founders and operations leads ask on the first call.
Per-mode, not per-philosophy. We map which modes the day contains and what proportion each occupies. Focus rows for heads-down work, speech-permitted zones for collaboration, phone-booth pods for video calls, glazed meeting rooms for syncs. The mix comes out of the work-mode math, not from a preference for "open" or "cells".
Yes — we design for current headcount plus a 24-month growth scenario. Height-adjustable desks, modular meeting tables, demountable phone booths, stackable seating. A 25-person fit-out reaches 50 with one weekend of reconfig. Beyond 24 months, the kit-of-parts approach lets you swap in larger zones without redesigning from zero.
Yes, on Full design and Premium. Núria signs the architect's report and files with the Ajuntament. Office use is usually a comunicació prèvia (4–8 weeks). Longer for activity-class change. Accessibility report per decret 141/2012 is in the file. Sound-limit certificate where the building bylaws ask for it.
Yes. The Full design package is built so an external fit-out contractor can quote and execute from it without guesswork. We coordinate with the project manager during the build. On Premium we add weekly site visits regardless of who the contractor is.
Both. We specify background-noise targets per zone (NC-30 to NC-40 typical) and detail wall, ceiling, baffle and partition build-ups to hit them. On Premium we measure post-build with a sound level meter and add baffles or absorbers where the measurement misses target. Acoustic remediation is the part most teams skip and regret.
Premium includes FF&E procurement: source, order, track, install. Premium contract suppliers (Vitra, Herman Miller, USM, Steelcase, Knoll, plus Spanish brands like Stua, Andreu World, Sancal). Trade pricing passes through. Full design specifies the FF&E and hands the list to your team to procure direct.
Yes. Hybrid changes the math: desk-to-headcount ratio drops to 0.6–0.7, video-call density rises, lounge and meeting-room demand goes up. We size the office around expected on-site density, not theoretical headcount. Booking-system advice (Robin, Envoy) and locker strategy included on Full design and Premium.
Yes. Madrid region, Bilbao, Valencia, Sevilla, Málaga, Mallorca. Brief workshop at our showroom or on site. Design work runs from Barcelona, sample sessions at our showroom or shipped to you. Premium supervision visits combine with regional construction trips. International offices on request when Spanish suppliers ship.
If the office sits inside a residential building, the renovation umbrella covers structural and shared-ownership coordination.
Free first consultation
Office design proposal in 7 working days.
Send the location, the floor area, the team size and the project stage. Núria organises the work-mode workshop and site visit, then sends a fixed-fee proposal within 7 working days, with deliverables and timeline laid out tier by tier.