Pre-fit check
Before unboxing the fixture: rough-in spacing measured against spec sheet, drain offset confirmed, supply pipe size verified. If it doesn't match, you find out before the wall is closed.
Fixture install · Spanish registry · Barcelona-wide
Toilets, sinks, taps, showers, bathtubs — installed properly. Pre-fit check against your rough-in, exact positioning, fresh isolation valves, hydro-test before tile or floor closes the chase. Dani is on the Spanish plumber registry, so the ACS certificate gets signed when the install needs one.
FIXTURES · BARCELONA · 2025
Fixtures fail at the connection, not the porcelain
A new toilet is the easy part. The fail points are everywhere else: the rough-in spacing that doesn't match the box, the isolation valve that should have been swapped while the wall was open, the silicone that bridges a gap it can't actually hold. We pre-fit against the connection before we open the box, replace the valves while we're there, and pressure-test before the tiler comes back.
Before unboxing the fixture: rough-in spacing measured against spec sheet, drain offset confirmed, supply pipe size verified. If it doesn't match, you find out before the wall is closed.
Old quarter-turn valves seize after 5–10 years. We replace them on every fixture install — €15 of brass that saves a flooding emergency the next time someone cleans behind the toilet.
Every supply connection pressure-tested before tile or floor closes the chase. 24-hour pressure log handed over. If a joint weeps, we find it the same day, not when it ruins your downstairs neighbour's ceiling.
We install what you bought. Roca, Grohe, Hansgrohe, Geberit, Duravit, anything from Leroy, Bauhaus or your designer. Spec sheet in hand, no on-the-fly improvisation.
Fixture quote · 5 questions, 1 minute
Five questions and Dani calls you back the same day. Single fixture from €350. Full bathroom set from €2 000 fixed. Hydro-test included on every install.
Two scopes, same hydro-test
Full bathroom fixture set: WC and tank, basin and tap, shower mixer or bathtub with mixer, towel radiator if you have one. Pre-fit check, isolation valves, hydro-test, silicone bead and joint sealing. Typical for one renovated bathroom or a full bathroom swap.

How we work · 4 stages
Spec sheets reviewed against your rough-in. Drain offset, supply size, mounting type confirmed before the box opens. Mismatches caught while the chase is still open.
Each fixture set on the template, levelled, fixings marked. WCs floor-anchored, basins wall-bracketed, baths legged and braced. Nothing hangs on silicone alone.
Fresh isolation valves, fresh flexis, new tap connectors. Silicone bead under sanitary-grade colour-matched. Drain traps installed accessible, not buried.
6 bar, 24-hour pressure test. Drain run with bucket, slow leak check on every joint. Pressure log, photos, warranty pack delivered with the keys.
Common fixture questions
Free site survey
Send your address, what you are installing, and the timeline. Dani calls back the same day to book the survey and confirm the price.