Manifold-fed runs
One manifold in the utility cupboard, one valve per fixture, one straight run to the tap. No buried tees behind tile. If a leak ever shows, you isolate that fixture without shutting the whole flat.
Water supply · Spanish registry · Barcelona-wide
Cold and hot supply for an apartment, villa or new build. PEX or copper to every fixture, isolation manifold in the utility cupboard, pressure regulator at the entry, ACS hot-water source sized to the demand. Dani is on the Spanish plumber registry — every joint pressure-tested at 6 bar, ACS certificate signed at handover.
SUPPLY · BARCELONA · 2025
Supply lines fail at the joint, not the pipe
Most leaks behind the wall are at hidden tee joints from previous renovations — a quick branch pulled off an existing line, no isolation, no pressure test, then plastered over. We do supply differently: every fixture goes back to a central manifold with its own valve, no buried tees, no hidden splices, and we hold pressure at 6 bar for 24 hours before tile or floor closes the chase.
One manifold in the utility cupboard, one valve per fixture, one straight run to the tap. No buried tees behind tile. If a leak ever shows, you isolate that fixture without shutting the whole flat.
PEX-A for renovations (flexible, fewer joints, sleeve-corrosion-proof), copper where the existing system is mostly copper or where heat resistance matters at the boiler. We tell you which and why at the survey.
Gas tankless for a small flat, electric tank for low-traffic, heat pump for sustained hot demand and lower bills. We size against actual fixture count and run length, sign the ACS, file with industry.
Every supply joint pressure-tested at 6 bar for 24 hours. Pressure log goes in the handover folder. If a joint weeps, we find it before tile, not when your downstairs neighbour calls about a stain on their ceiling.
Supply quote · 5 questions, 1 minute
Five questions and Dani calls you back the same day. Survey is free. Fixed-price quote within 48 hours of the visit, with the manifold layout and ACS sizing attached.
Two scopes, same hydro-test
60–120 m² apartment, single hot-water source. New manifold in the utility cupboard, PEX-A or copper to every fixture, pressure regulator at entry, ACS hot-water tank install with the certificate signed. Typical for one or two-bedroom flats during a renovation.

How we work · 4 stages
Free site visit. We list every tap, shower, washer and dishwasher, measure the runs, check the entry pressure, decide PEX vs copper. Same-week slots, written report within 48 hours.
Where the manifold lives, how many ports, how the runs leave it. ACS hot-water source sized against demand. You see the layout and the fixed-price quote together.
Manifold mounted, lines pulled, no joints inside the wall, all elbows accessible. Aigues meter swap or supply increase coordinated with the distributor while we are on site.
6 bar pressure test, 24 hours, log delivered. ACS certificate signed for the hot-water source. Pressure regulator set, recirculation loop balanced if the install has one.
Common supply questions
Free site survey
Send your address, the scope, and the timeline. Dani calls back the same day to book the survey and confirm the price corridor.