Full apartment replumb
Old galvanised steel and undersized copper pulled out. New runs in copper trunk + PEX to fixtures. Hot-water loop sized so the tap delivers in under 15 seconds. Isolation valves on every fixture.
Plumbing works · Spanish registry · Eixample · Sarrià · Maresme villas
Reform-scale plumbing works for apartments and villas: full replumbs, drain-stack replacement, multi-bathroom installs, ACS hot-water systems, pati de llums riser work. Pressure-tested at 6 bar before tile or floor closes the chase. Spanish-registry team, certificate at handover.
REPLUMB · EIXAMPLE · 2025
Reform-scale, not call-out
Full apartment replumbs, drain-stack replacements and multi-bathroom installs run alongside renovation. Walls open, chases run, every joint pressure-tested at 6 bar for 24 hours before tile or floor closes the chase. ACS certificate signed at handover.
Old galvanised steel and undersized copper pulled out. New runs in copper trunk + PEX to fixtures. Hot-water loop sized so the tap delivers in under 15 seconds. Isolation valves on every fixture.
Cast-iron stacks from 1880–1920 still in service across central districts. We replace failing sections in PVC or HDPE through the pati de llums riser. Coordinate with the comunidad if shared.
Every install pressure-tested at 6 bar for 24 hours. Pressure log goes in the handover folder. If the test fails, we find the leak and refit before tile or floor closes the chase. No leaks discovered weeks later.
Hot-water installs (ACS) require a licensed Spanish-registry plumber. Dani signs at commissioning — what you need for sale, insurance, manufacturer warranty.
Plumbing works quote · 5 questions
Five questions and Dani schedules the site visit. Fixed-price quote within 5 working days, sized to your scope, with hydro-test and ACS certificate included at install.
Two install scales
New copper trunk and PEX runs to all fixtures, isolation valves, hot-water loop sized for the flat. Existing drain stack kept where it is in good order. Right for 60–100 m² apartment replumb during renovation.

How we work · 4 stages
Half a day on site. Measure, check existing stack, plan supply runs. Output: pipe sizes, manifold locations, ACS configuration, fixture list.
Within 5 working days. Materials, labour, ACS filing fees, comunidad coordination if shared stack. Line by line. You approve before any work proceeds.
Walls and floors chased before any other trade closes them. Copper trunks pulled, PEX runs to fixtures. Drain runs sized correctly. Hydro-test before tile or floor closes the chase.
System pressurised, hot-water loop balanced, ACS certificate signed. You get the pressure log, warranty pack, manifold diagram.
Common questions
Free first consultation
Send your address, the property scope, and what you have in mind (replumb, stack replacement, multi-bathroom, ACS). Dani schedules the site visit, runs the plumbing map, sends a fixed-price quote within 5 working days.