In Barcelona since 2018
200+ apartments delivered across Eixample, Gràcia, Sarrià, Sant Martí, Poblenou, Les Corts.
est. 2018 · 200+ flats · 4.9★ Google
Turnkey apartment renovation in Barcelona — Eixample, Gràcia and Sarrià flats delivered with fixed-price contracts, single project lead, 24-month workmanship guarantee, and finishes you'd expect in a Wallpaper feature.
PROJECT 47 · EIXAMPLE · 2025
Why TrueHomeBuild · in numbers
Six concrete commitments. Every number is verifiable — every guarantee is in your contract.
200+ apartments delivered across Eixample, Gràcia, Sarrià, Sant Martí, Poblenou, Les Corts.
128 verified reviews from owners who lived through the build. 42 projects published on Houzz España.
2-year guarantee on every detail of the build, 10-year structural cover under Spanish LOE law. Same foreman fixes any snag.
Line-by-line estimate signed before we start. The price changes only if you change scope. No mid-project surprises.
One person owns your project end-to-end. You have one phone number, one WhatsApp, one weekly photo report — not a phone tree.
Site teams led by foremen with 10+ years' Spain experience. Licensed electricians, plumbers, carpenters on payroll — not subcontractors.
Step-by-step quote · 90 seconds
Most contractors give you a 4-line email three days later. We give you a fixed-budget contract with material breakdowns — by the end of this quiz.
Our renovation tiers
Four distinct service tiers — from light cosmetic refresh to designer-led transformation. Fixed price per m². Material breakdowns are public.
The fastest path to a flat that looks like a different place to live. Paint, surfaces, finishes, light electrical and plumbing fixtures — no structural work.

How we work · 6 steps
No surprises. Each step has a deliverable, a deadline, and a named person responsible.
Free 60-minute walk-through. We measure, photograph, and listen to what you actually want to fix.
Within 24 hours: line-by-line PDF estimate — every fixture, every coat, every meter of cable.
For Designer-tier projects: concept, mood-boards, 3D, material samples in our showroom on Passeig de Maragall.
We file the llicència d'obres, notify neighbours, and prepare the technical memorandum on your behalf.
Single foreman on site daily. Weekly photo report. Material sourcing handled — invoices flow to us, not you.
Snag walk, keys, 2-year workmanship guarantee. Same foreman fixes any issues for the duration.
Meet the team · director and senior leads
Director plus three senior leads. One of them will run your project from first call to handed-over keys, and the director signs off on every contract before work starts. Below is the public-facing four — 12 more people on the full team page.

Director · founder · 18 yrs
Founded TrueHomeBuild in 2018. Reviews and signs every fixed-price contract personally before the build phase begins. Reachable on the same WhatsApp number as the rest of the team.

Senior project lead · 12 yrs
Eixample and Gràcia specialist. Led 80+ flat renovations including original-tile restorations and acoustic isolation in pre-war buildings.

Designer-tier lead · 10 yrs
Architect by training, runs the Designer-tier projects. Handles concept, 3D, lighting plans, and material sampling at our Maragall showroom.

Build foreman · 14 yrs
Daily site lead. Licensed electrician and plumber on Spanish registry. Owns the build phase and weekly photo reports.
Renovation snapshot · 2025 in numbers
We don't run on round-number marketing. These are the numbers from our project log — what we delivered, where, and how often we hit the contract date.
Across Eixample, Gràcia, Sarrià, Sant Martí, Poblenou and Les Corts. 8 cottages outside Barcelona handled by the national team.
94% of 2025 projects handed over on or before the contracted date. The 6% that slipped were due to material lead times we flagged in week 1.
Median 2025 fixed-price contract for a full-apartment renovation. Range was €1,800/m² (cosmetic) to €4,400/m² (designer-tier with structural).
0 client-paid scope creep on 2025 fixed-price contracts. Where we found hidden problems (asbestos, ungrounded wiring), the contract price held; we quoted optional extras transparently.
From first phone call to signed contract. The on-site visit happens within 48 hours, the line-by-line PDF lands within 24h of the visit.
Median number of items on the snag walk at handover. All cleared inside the first 7 days under workmanship warranty by the same foreman who built the flat.
Cost of additional services
Most of these come up during a renovation. They're priced publicly so you can see the line items before the visit. Final quote depends on the apartment, but these are the bands we actually use.
All prices in EUR, VAT excluded. Final figures are confirmed after the on-site visit and locked into the fixed-price contract before any work starts.
Owner reviews · 4.9★ on Google
They finished a week early with the budget intact — in a 100-year-old Eixample flat with three layers of plaster hiding original tiles. I'd hire them tomorrow.
We bought the flat from the UK and managed the entire renovation remotely. Weekly photo reports, fixed price, keys waiting when we landed in Barcelona. Zero stress.
The llicència d'obres alone scared off two other contractors. TrueHomeBuild handled the Ajuntament paperwork, the architect, and the neighbours' meeting in three weeks.
Service area · Catalonia
Daily presence in Barcelona city plus the inner Metropolitan ring. For Costa Brava and Mallorca we run our national-projects team.
Common questions, honestly answered
Free first consultation
Leave your number and a few details about your flat. Albert or Núria will reply with a line-by-line PDF estimate by tomorrow.